Submit your Commissioning RequestPlease submit the form below for your commissioning requestPlease enable JavaScript in your browser to complete this form.Please enable JavaScript in your browser to complete this form. - Step 1 of 3Commissioning appliance type *FurnaceWater Tank / Tankless / Water HeaterFireplaceGas RangeIf any appliance is not listed that you require commissioning for, please contact us directly to discussFurnace ChecklistGas meter is unlocked by the local gas utility and is already on, or supply piping is at the meter ready to be connected.Gas piping is installed to the furnace.House has a working hydro meter installed.Completed power to the furnace with thermostat checked and working by an electrician (checked if the furnace fan turns on).Venting is properly connected inside to the furnace and vent terminations are fully completed/compliant outside.Furnace has new Merv 11 filter.Home is in compliance with the requirements for construction heat furnace activation set by local gas utility and manufacturer instructions.All house vents have been uncovered to provide proper airflow / furnace commissioning testing.Water Tank / Tankless / Water Heater ChecklistGas meter is unlocked by the local gas utility and is already on, or supply piping is at the meter ready to be connected.Completed power to the unit.All water lines capped off and main water valve is on, and water is available at the unit.Condensate hose installed.All venting and external vent terminations complete.Gas piping completed to unit.Manual is with unit.Fireplace ChecklistPiping completed for fireplaceFireplace installation completeGas meter turned on and ready for useElectrical setup completeGas Range Checklist *Gas connection hookupPower connection completed/testedHood fan installed and workingTipping bracket installedPlease note that each lot requested for commissioning not meeting the above checklist requirements are subject to not ready charge. *We prioritize our workday to meet our clients needs and as such are unable to backfill any work from missed lots. These charges are to cover our technician’s compensation and expenses. If you have any questions, please contact our office to discuss in further detail.I AcceptBuilder *Site Address *Site *City *Lot Numbers and Civic AddressOne lot per line, provide lot number and address for each. Contact Name *Phone Number *Contact Email *Please attach P.O. to this request (Only requests with P.O. attached will be scheduled)**:**Not required for contract customers P.O. #Date ready for Commissioning *Attach P.O. PDF or Image Click or drag a file to this area to upload. Additional CommentsNextUpdating preview…Please confirm the information you have submitted below and press Submit to continue. By submitting this form, you are confirming the requested sites will be ready for commissioning by the indicated service date.Confirmation *I confirm the above information is correct and certify the lots will be ready on the indicated date.PreviousSubmit